Swimming Pool Projects
Tudor Grange Leisure Centre, Solihull
Working on behalf of Leadbeater Construction this was a three pool contract.
It involved a large swimming pool, small pool and diving pool; all are 100% level deck with independent water treatment plants. We utilised Filtration Ltd’s proven floor inlet system to ensure an even distribution of filtered sterile water throughout the pool area and volume.
A moving floor on the diving pool also enables multi purpose use. Please see Movable Pool Floors for more details of this feature.
Llandudno Leisure Centre
On this project we worked on behalf of Kier North West Ltd on a contract for Conway Borough Council.
The project involved a large pool and a small pool, both with movable floors. Both pools are level deck with independent filtration plants, complete with ultra violet sterilisation in addition to chemical controls.
The movable floor in the small pool provides a facility for swimming lessons for very young children.
Freemans Place Leisure Centre, Durham
For this leisure centre contract our client was Bluestone Ltd of Leeds. We installed the water treatment to a large pool and a small pool, both with moveable floors. Both pools are level deck with Filtration Ltd’s variable extract system, served by independent filtration and chemical dosing plants, with the addition of ultra violet.
We also installed underwater speakers for the benefit of synchronised swimming classes.
Rugeley Leisure Centre
This project was for Cannock Chase Council, the main contractor being Tomlinson Builders Ltd. The project was a 25m level deck swimming pool incorporating Filtration Ltd’s floor inlet and variable water extraction systems. We also installed UV and automatic chemical control.
Electrical Systems Installation
For each of the above projects we supplied and installed the electrical control panels and all electrical cabling.
South Woodham Ferres Pool, Essex.
This project was a 25m level deck pool with variable draw off facility. This pool has a moving floor and to enhance the safety and quality of the water we have installed U.V. treatment in addition to standard chlorination and pH control.
Porchester Pools
This installation is situated in West London and now operated by Cannons Club.
This listed building with magnificent ballroom, library, steam and sauna rooms together with a 486m3 large pool and a 338m3 small pool was constructed in the mid 1920’s. The original filtration plant and cast iron pipework has been replaced as follows:
Each pool is independently served by two full duty pump sets with stainless steel manifold pipes, and PVC circulating pipework. WE also installed a scum extract system, auto top up following filter backwash, chemical monitoring and control, UV and wall mounted control panel.
Three horizontal GRP filters serve the large swim with two similar units for the small swim. The system is complete with stainless steel frontal pipework and valves to provide an interlink facility between all 5 filter units.
Halewood Leisure Centre Pool
Situated in the City of Liverpool this 100% level deck pool, 25m x 15m incorporates a moving floor and is served by three 50% duty vertical pump sets. We applied stainless steel manifolds on both pump sets and included filter frontal pipework. Two 2600 diameter steel filters complete with valves, air release and air scour serving fifteen wall inlets to enable the floor to be raised and lowered for various water sports.

|